How to Finance a Home Extension: A Londoner's Guide
Homeowners often start looking into how to finance a home extension at the same moment they realise they’ve run out of house. The spare room is now a nursery, the kitchen is too tight for daily life, and moving from Clapham, Fulham or Dulwich into a larger London property looks far more expensive than adapting the one you already own.
That’s usually the right instinct. An extension can solve a space problem and strengthen the value of the property, but only if the finances are handled properly from the start. The mistake I see most often isn’t poor design. It’s going into the project with a loose budget, the wrong funding method, and no plan for how money will be released during the build.
London adds another layer. Period houses come with planning constraints, Party Wall issues, access problems, conservation area requirements, and higher costs for specialist trades and materials. A rear extension on a straightforward site is one thing. A side return on a Victorian terrace in Kensington or Fulham is something else entirely.
Your London Home Extension Dream Starts Here
You get the architect’s first sketch back for a side return in Fulham. It solves the cramped kitchen, adds light, and makes the ground floor work properly. Then the finance questions start. How much cash should stay untouched? Will the lender release enough, early enough? And if the house is Victorian, listed, or in a conservation area, will the quote still hold once opening-up work begins?
That is the point where an extension stops being a nice idea and becomes a managed financial project.
In London, the gap between a rough idea and a fundable project is often wider than homeowners expect. Period properties in Kensington, Fulham, Chiswick and similar areas can look straightforward from the street, but costs shift quickly once you factor in party walls, restricted access, matching brickwork, bespoke sash details, structural steel, and borough-specific planning requirements. On many jobs, the money is not just for building more space. It is for handling the complications that come with building onto an older London house.
A sound finance plan gives you two things. It keeps the project moving, and it protects you from making rushed decisions halfway through the build. I have seen clients get into trouble not because the extension was too ambitious, but because the funding was set up around an optimistic figure, with no allowance for specialist items or staged payments to the contractor and key suppliers.
Before you choose any borrowing route, get a clear view of the full spend. A good starting point is a renovation hidden costs estimator for extension budgets, because early omissions are what usually damage the finance plan later.
What a sound finance plan looks like
A workable extension finance plan usually has four parts:
- A cost plan grounded in the actual property: That means design fees, approvals, structural input, contractor costs, specialist materials, and a sensible contingency.
- Funding that matches the size and timing of the job: Some projects suit savings and a remortgage. Others need a mix, especially where funds must be released in stages.
- Paperwork a lender can follow easily: Clear drawings, a written scope, quotes, proof of income, and a simple explanation of what is being built.
- Payment control once work starts: Agreed stage payments, deposit terms for long-lead materials, and written rules for variations.
One practical rule matters more than anything else. Set up the full funding position before site start. An extension that is only partly financed becomes expensive very quickly, especially in London where delays, specialist trades, and material lead times can push costs up fast.
The question is rarely just "can I afford the extension?" It is "can I fund this properly from first drawings to final sign-off, without putting the rest of the household under strain?" That is the standard to work to.
Accurately Estimating Your London Extension Costs
A family in Fulham gets a builder’s quote that looks manageable, then actual numbers start appearing. Steelwork increases after structural calculations. The party wall surveyor is needed because both neighbours are affected. The rear garden only has access through the house, so labour, protection, and waste removal all cost more than expected. That is how extension budgets drift off course in London.

Start with a buildable price, not a hopeful one
The number that matters is the full project cost for your specific house, in your borough, with your level of finish. A rear extension in a modern house with clear side access is priced very differently from a side return on a Victorian terrace in Kensington, where matching brickwork, preserving original features, and working around tight site conditions all affect cost.
A proper budget usually includes:
- Design work: Measured survey, concept drawings, planning drawings if required, and technical drawings for construction.
- Structural engineering: Beam and padstone design, foundation guidance, and calculations for building control.
- Planning or lawful development input: Some projects fall under permitted development. Others need a full planning application, especially in conservation areas or on altered period homes.
- Building control charges: Plan checks, inspections, and sign-off.
- Party Wall costs: Common on terraced and semi-detached properties across London.
- Site setup and protection: Dust screens, floor protection, temporary kitchen arrangements, security, scaffolding, and welfare.
- Main construction: Groundworks, drainage, brickwork, roofing, windows and doors, insulation, plastering, electrics, plumbing, heating, and decorating.
- Fit-out items: Kitchen, bathroom, flooring, glazing upgrades, joinery, and external making good.
- Temporary living costs: Storage, extra travel, partial decant, or short-term accommodation if the works are disruptive.
I tell clients to treat the builder’s figure as one part of the total, not the total itself.
Why London extension costs vary so much
Two drawings can look almost identical and still produce very different prices. Access is one reason. If materials have to come through the hallway instead of down a side path, the job takes longer and protection costs rise. Parking suspensions, skip licences, controlled delivery hours, and borough rules can add real cost before a brick is laid.
Period properties add another layer. Victorian and Edwardian houses often contain surprises once work starts: shallow foundations, old drains, chimney breast alterations, uneven walls, or timber that has been cut during earlier refurbishments. In boroughs with stricter planning scrutiny, matching London stock brick, timber sash proportions, slate roofing, or lime-based finishes can also push the budget up.
Specialist materials are often where homeowners get caught. Reclaimed bricks, bespoke joinery, heritage rooflights, and made-to-measure glazing usually need deposits early and longer lead times. That matters for finance because your cash flow has to cover those orders before the final stages of the build.
Break the budget into cost groups
A simple way to test whether the numbers are realistic is to separate them by timing and risk:
| Cost group | What it includes | Why it matters |
|---|---|---|
| Pre-construction | Surveys, design, engineering, planning, party wall, building control | These costs arrive before the main contract starts |
| Build costs | Demolition, groundworks, structure, roof, glazing, first fix, second fix, finishes | This is where most of the money goes |
| Variable costs | Hidden defects, specification upgrades, drainage changes, specialist materials | These are the items that usually stretch the budget |
For an early sense check, use a renovation hidden costs estimator for extension budgeting. It is more useful than a headline square metre figure because it forces you to price the awkward parts as well as the visible ones.
Homeowners comparing international renovation advice sometimes read guides on New Zealand home upgrades, but London extensions need tighter allowance for planning constraints, access, and older housing stock.
Set a contingency that reflects the house
Contingency should match the risk in the property, not an arbitrary percentage copied from a generic guide. A straightforward extension on a newer house may justify a lower allowance. A period property with structural alterations, drainage uncertainty, or conservation area details needs more breathing room.
That is especially true where the extension ties into existing rooms. Once ceilings, floors, and walls are opened up, there is often follow-on work that was impossible to confirm at quote stage. Good budgeting accepts that reality early.
A useful walkthrough of early budgeting issues is below.
A budget should answer these questions
Before approaching a lender or signing with a contractor, get clear answers to these points:
- What exactly is being built? Side return, rear extension, wrap-around, loft with rear extension, or internal reconfiguration plus extension.
- What level of finish is included? Shell only, builder’s finish, or full turnkey fit-out with kitchen, flooring, decorating, and external works.
- Which items sit outside the contract sum? Appliances, specialist lighting, fitted furniture, party wall fees, planning conditions, and utility upgrades often do.
- What needs to be matched or specially ordered? Reclaimed brick, timber windows, stone sills, cast-iron rainwater goods, or bespoke joinery can change both price and payment timing.
- When are payments due? Deposits for glazing, steels, kitchens, or custom materials often fall earlier than homeowners expect.
The clients who manage extension finance best are usually the ones with the clearest scope, the clearest exclusions, and enough room in the budget for a London job to behave like a London job.
A Complete Guide to Home Extension Finance Options
A couple in Fulham might have £80,000 in savings and still need finance for a side return once the kitchen, glazing, steels, party wall costs, and temporary living arrangements are counted properly. A family in Kensington may have plenty of equity on paper but find that lender timescales do not match a contractor’s payment schedule for bespoke windows or long-lead stone. The right finance option depends on more than the headline build cost. It depends on cashflow, timing, and how much risk your household can carry while the work is live.
For London extensions, the main routes are usually savings, remortgaging, a further advance, a secured home improvement loan, a personal loan for smaller sums, or bridging finance where timing is tight. Each has a place. Each also has a point where it becomes expensive or awkward.
Comparison of Home Extension Financing Options 2026
| Financing Option | Typical Amount | Interest Rate (Est.) | Best For... | Key Consideration |
|---|---|---|---|---|
| Savings | Depends on your available cash | Not applicable | Smaller projects or part-funding | Reduces liquidity and emergency reserves |
| Remortgage | Larger borrowing needs | Qualitative only | Big projects where monthly affordability is strong | Ties extension finance to your main mortgage |
| Further advance from existing lender | Qualitative only | Qualitative only | Borrowers who want to stay with their lender | Approval depends on lender criteria and equity |
| Home improvement loan or secured loan | Medium to large borrowing, depending on income and security | Qualitative only | Medium to large projects needing separate borrowing | Monthly repayments must fit your wider budget |
| Personal loan | Smaller borrowing needs | Qualitative only | Limited scope works or topping up savings | May not suit larger London extension budgets |
| Bridging finance | Short-term borrowing | Qualitative only | Fast starts where permanent finance is pending | Expensive if the exit plan is weak |
| Equity release for older owners | Qualitative only | Qualitative only | Certain over-55 homeowners with substantial equity | Long-term implications need careful advice |
Using savings
Savings give you speed and control. There is no lender approval holding up the start date, and staged payments can be made as soon as invoices are due.
That said, using all available cash on the build is how households get caught out when the first variation lands. On London period properties, it does not take much. A drainage issue, hidden structural movement, or the need to match existing joinery can change the numbers quickly. In practice, I usually see savings work best as part-funding, with a reserve kept back for surprises and for life outside the project.
Remortgaging or taking a further advance
For larger extensions, this is often the lowest-friction long-term borrowing route if affordability is solid. Spreading the cost over a longer term can make monthly payments manageable, especially when the alternative is stacking shorter, more expensive products.
A remortgage suits owners already close to the end of a fixed term or willing to change lender. A further advance can be cleaner if your current mortgage deal is worth keeping. The trade-off is timing. Lenders work to their own process, not your contractor’s programme, and that matters if you need funds released before excavation starts or before placing orders for custom materials.
Secured loans and home improvement borrowing
Secured borrowing can make sense where remortgaging would trigger early repayment charges, disturb a very good existing rate, or take too long. It is also a practical option for owners who want the extension borrowing ring-fenced from the main mortgage.
For a homeowner trying to line up finance with a live build programme, that flexibility can be useful. A good starting point is this guide to getting a home renovation loan in the UK, which explains the documents and lender checks you are likely to face.
Personal loans for smaller scopes
Personal loans are usually better for topping up a budget than funding a full structural extension. They can work for finishing items, light internal alterations, or a modest package of works where the main structure is already covered by savings or mortgage borrowing.
Once the scheme includes significant groundworks, structural steel, roof alterations, and full kitchen installation, the numbers usually outgrow this route.
Bridging finance for timing problems
Bridging finance is a specialist tool for a specific problem. It can help where a sale, remortgage, or longer-term facility is coming, but the build needs to start first.
Use it carefully. Monthly costs can build fast, and the exit route needs to be clear before you sign anything. In contractor terms, bridging can solve sequencing. It should not be the plan holding the whole project together.
Borrow short-term money only when you know exactly how it will be repaid or replaced.
Looking beyond one market for practical ideas
Some of the better renovation finance guidance outside the UK is still useful because the practical questions are the same. How much cash is needed at the start, how much is due mid-build, and how much contingency should stay untouched. Homeowners comparing approaches sometimes look at how lenders discuss New Zealand home upgrades, because the product names may differ but the cashflow logic is familiar.
Which option usually works best
For a defined extension with sensible contingency, savings plus a modest loan is often the safest mix. For a larger rear or wrap-around extension, remortgaging or a further advance usually gives the most manageable monthly cost. Secured borrowing suits owners who do not want to disturb their main mortgage. Bridging finance suits a timing gap with a firm exit plan.
Choose the route that leaves room for the build to behave like a London build. If the funding works only on the assumption that nothing shifts, nothing delays, and nothing extra is found once walls and floors are opened up, the finance is too tight.
Financing Challenges for London's Period Properties
Period homes need a different finance mindset. A Victorian terrace in Fulham or an Edwardian house in Dulwich may be structurally sound and hugely attractive to buyers, but lenders and contractors both know these buildings can behave differently once work starts. If you budget them like modern stock, you usually under-budget them.

Older houses come with lender and build complications
Financing period home renovations requires navigating specific UK constraints. Lenders may cap equity release at 85% LTV without heritage assessments, and specialist materials can add 10% to 15% to costs, according to guidance discussing heritage-related renovation finance issues.
That matters in real life because generic borrowing products are often sized around standard works. Period houses often need non-standard work.
Think about what sits behind a typical rear extension on an older terrace:
- Breathable materials: Lime plaster and compatible finishes rather than sealing moisture into the building.
- Matching brickwork: Reclaimed or carefully selected facing brick instead of the nearest stock substitute.
- Joinery quality: Sash details, mouldings, and timber repairs that fit the existing property.
- Borough oversight: Conservation area considerations can influence design choices, even where an extension is broadly feasible.
- Party Wall procedures: Especially relevant on tightly arranged terraced streets in Kensington, Fulham, Clapham and similar areas.
Why period homes need a wider funding brief
A common mistake is borrowing only for the obvious extension shell. On older houses, the build often triggers connected works. Floor levels may need adjustment. Existing drainage may need rerouting. Internal walls may need remedial work where the new structure ties into the old one.
Those items aren’t upgrades for the sake of it. They’re part of doing the extension properly.
The more character a house has, the more care the budget needs. Character is valuable, but it isn't cheap to alter well.
Green upgrades are no longer a side issue
Older London homes now face another pressure. Energy performance upgrades are increasingly tied to extension decisions. If you’re opening up a rear wall, replacing glazing, or upgrading major systems, the conversation often widens from square footage to thermal performance.
That’s where specialist products such as Green Home Finance and retrofit loans can become relevant. They aren’t suitable for every owner, but they can help if the project includes insulation improvements, heating upgrades, or other compliance-led works that sit beyond the pure extension shell.
For period homes, the challenge is balance. You don’t want to damage the fabric of the building by choosing the wrong modern treatment. You also don’t want to finance only the visible part of the job and then discover the compliance element has no budget behind it.
Practical approach for period-property owners
If you own an older London house, build your finance plan around the property’s actual condition and constraints:
- Get drawings that reflect the age of the building. Not every designer handles junctions, materials and detailing for period stock well.
- Price specialist items early. If sash work, lime products or careful brick matching are likely, treat them as core cost, not optional trim.
- Ask how the lender values the property pre-works and post-works. Heritage sensitivity can affect assumptions.
- Leave room for compliance-led upgrades. They can become necessary once technical design progresses.
That approach is slower than plugging a number into a calculator, but it’s far safer.
Preparing Your Application and Securing Your Funds
A typical London finance application goes wrong in a very ordinary way. The homeowner has a planning drawing, a rough figure from a builder, and a borrowing target based on what feels affordable. Then the lender or broker asks for clearer costs, a better scope, proof that the design is buildable, and the whole process slows down.
Good applications are much simpler than many owners expect. They are clear, consistent, and specific enough for a valuer, underwriter, and contractor to reach the same conclusion about the job.
In practice, the best file looks less like sales paperwork and more like a stripped-back build pack. For a Victorian terrace in Fulham or a stucco-fronted house in Kensington, that matters. Period properties often come with details that affect borrowing confidence, such as party wall risk, drainage changes, basement history, conservation area constraints, and specialist materials that cost more than standard modern equivalents.
What to gather before you apply
Before you submit anything, assemble the documents that answer the lender's basic questions.
- Architectural drawings: Clear existing and proposed plans, sections where needed, and enough detail for a valuer to understand the scheme.
- A written scope of works: This should explain what is included, what is excluded, and any assumptions behind the price.
- Detailed contractor pricing: A breakdown by trade or work stage carries more weight than a single lump sum.
- Planning documents: Approval, lawful development certificate, or evidence that the application is underway if timing allows.
- Proof of income and outgoings: Payslips, accounts if self-employed, mortgage details, and regular commitments.
- Property information: Title details, lease terms if relevant, and anything unusual such as restrictive covenants or access issues.
If your contractor has experience with paperwork as well as site delivery, that helps. A builder who understands what a general contractor actually manages on an extension project can often spot gaps in the scope or pricing before the lender does.
Why valuation often decides the pace of approval
Owners tend to focus on the loan product. Lenders focus on risk.
The valuation sits in the middle of that. The surveyor is looking at the property as it stands, the credibility of the proposed works, and whether the end result makes sense for the street and local market. If the design is undercooked, the quote is vague, or the budget ignores obvious costs, that weakens the file even if your income is strong.
This comes up a lot with London period homes. On paper, a side return or rear extension may look straightforward. On site, the valuer may know the road is full of shallow drains, tight access, chimney breast alterations, or conservation controls that make build costs less predictable. A realistic application acknowledges those risks instead of pretending they do not exist.
Show the full cost, not the optimistic cost
One of the most common mistakes is presenting only the shell-and-core figure. Lenders and brokers see through that quickly, and homeowners end up short of funds later.
Your cost plan should usually account for:
| Application item | What good looks like |
|---|---|
| Build scope | Matches the drawings and written specification |
| Contractor pricing | Broken into clear work packages or stages |
| Professional fees | Design, structural engineering, building control, and other required input |
| Statutory matters | Planning costs, party wall costs, Thames Water build-over consent if needed |
| Specialist items | Sash work, brick matching, rooflight upgrades, bespoke joinery, conservation-led materials |
| Contingency | A sensible allowance for hidden conditions and scope pressure |
| Affordability | Repayments still work against your real monthly budget |
For period properties, specialist items should be named plainly. If you know the project may need lime plaster repairs, reclaimed stock brick, handmade clay tiles, or bespoke timber windows to satisfy local expectations, include them. In boroughs with stricter design scrutiny, trying to bury those costs in a general contingency usually creates problems later.
Energy and compliance costs belong in the main application
As noted earlier, extension projects in London can trigger wider upgrade costs. Thermal upgrades, ventilation changes, glazing requirements, and heating alterations often move from "nice to have" to part of the technical solution once drawings develop.
Put those items in the finance plan from the start. Do not hide them in a vague allowance and hope they stay optional. If Building Control or your designer is likely to require related work, the lender should see that the budget already makes room for it.
How to make the file easier to approve
A tidy application does not need polished presentation. It needs consistency across every document.
Use this check before submission:
- The scope matches everywhere. Drawings, contractor pricing, and the loan amount should describe the same job.
- The numbers are believable. If the quote looks light for your area or property type, expect questions.
- The timing is realistic. Leave room for planning conditions, party wall notices, lead times, and lender processing.
- The affordability case is honest. Base repayments on your actual household spending, not a best-case month.
- The known risks are acknowledged. Access limits, structural unknowns, specialist finishes, and neighbour matters should be visible in the file.
Best habit: If an underwriter points at any major cost line, you should be able to explain it clearly in one sentence.
Check your credit file early as well. Clear small short-term debts if that improves affordability, and avoid sending multiple rushed applications through different channels at once. In lending, messy presentation can look like project risk even when the design itself is sound.
The homeowners who secure funds with the least friction are usually the ones who treat the application like part of the build, not a separate admin task.
Smart Financial Management with Your Contractor
Getting the funds approved is only half the job. The other half is making sure the money is managed properly during construction. This management determines whether homeowners can protect themselves or expose themselves, depending on how the contract and payment schedule are set up.

Estimate versus fixed quote
An estimate is an informed early view of likely cost. It helps you judge whether the project is viable. It is not the same as a final price commitment.
A fixed quote is far stronger from a financial control point of view because it defines what is included for a stated amount. That doesn’t eliminate variations. If you change the scope, the price can still change. But it gives you a stable baseline for borrowing and payment planning.
This is one reason homeowners benefit from understanding what a general contractor does. Good contractors don’t just organise trades. They coordinate pricing, sequencing, compliance, and payment control.
Stage payments protect both sides
The safest projects use staged payments linked to visible milestones. That gives the contractor cashflow to keep labour and materials moving, while giving the homeowner confidence that payments correspond to actual progress.
Typical stage structures vary, but the principle is consistent:
- Initial deposit: Usually tied to booking, programme allocation, and early procurement.
- Groundworks and structure stage: Paid when the shell is materially progressing.
- First fix stage: After core services and major structural internals are in.
- Second fix and finishes: Linked to completion of fit-out elements.
- Final payment: Paid once snagging is addressed and completion is properly evidenced.
If a contractor asks for too much too early, pause and ask why. If a homeowner expects the builder to self-fund the entire project until the end, that’s unrealistic too. A balanced schedule is what works.
Variations need a written rule
Most extensions change slightly as work progresses. A steel may need resizing. Drainage may be different from the drawing. You may decide to upgrade a rooflight or alter joinery details. The problem isn’t variation itself. The problem is variation without a written process.
Use a simple rule:
- Identify the change.
- Price the change.
- Approve the change in writing.
- Add it to the running total.
That keeps the finance picture honest.
If a variation isn't priced and agreed before the work proceeds, it tends to become an argument later.
Keep a retention mindset
A small retention at the end can be sensible, provided it is agreed fairly in the contract and tied to genuine snagging completion. That gives homeowners a final layer of protection without starving the builder of cash through the main works.
Financially, the cleanest projects are rarely the cheapest headline quotes. They are the ones with clear scope, sensible staging, prompt paperwork, and no ambiguity about who approved what.
Frequently Asked Questions on Financing an Extension
Can I finance an extension before planning permission is approved
Sometimes, yes, but it depends on the product and the lender. Some lenders are comfortable assessing an application while planning or lawful development paperwork is in progress, especially if the project appears straightforward. Others will want formal approvals in place before they treat the build cost and end value as reliable.
If your design is likely to face borough scrutiny or neighbour issues, it’s usually better to secure the planning position first. That reduces uncertainty in both pricing and lending.
Is it better to use savings or borrow
It depends on what the savings are for. Using some cash can reduce borrowing pressure and show financial discipline. Using all of it can leave you exposed if the project uncovers hidden issues or your household has an unrelated emergency.
A blended approach often works well. Keep enough liquidity so the extension doesn’t become your only financial priority.
Can I borrow based on the property's value after the extension
Some finance routes consider the likely post-works value as part of the decision. That’s especially relevant on larger renovations and on homes where the extension materially improves layout and market appeal. The strength of the drawings, quote, and valuation evidence all matter here.
Be careful not to over-assume the uplift. Lenders tend to prefer grounded, supportable schemes rather than optimistic figures.
What if my house is Victorian or in a conservation area
Then your funding plan should be more cautious from the start. Period details, approvals, and specialist materials can all change the cost profile. In conservation areas, design changes that seem minor to an owner can carry more significance in the approval and pricing process.
Treat specialist materials and compliance as core costs. Don’t leave them to chance.
Will lenders finance the kitchen as well as the extension shell
Often they can, if the kitchen forms part of the overall project and the quote is structured clearly. Problems usually arise when the shell cost is documented but the fit-out cost is vague. If the extension only becomes usable once the kitchen is installed, present the project that way.
A half-described project is harder to fund than a complete one.
How do I avoid running out of money mid-project
Three habits help most:
- Borrow or reserve enough for the actual scope, not the idealised scope
- Use written stage payments and variation approvals
- Keep a buffer outside the core contract sum
Running out of money usually comes from under-scoping, not bad luck.
Are green loans worth considering for an extension
They can be, particularly if the project includes insulation, heating upgrades, or energy-related compliance work that would otherwise strain your main extension budget. They aren’t automatically better than standard borrowing, but they may be worth investigating if the energy element is substantial.
The key is to separate lifestyle upgrades from compliance-led upgrades when reviewing finance options. That makes product matching easier.
Should I wait until I have all the cash saved
Not always. Waiting can be sensible if your plans are still developing or your finances are stretched. But waiting isn’t automatically cheaper or safer. If the household is cramped, the design is settled, and the funding route is sustainable, a staged finance plan can be more practical than delaying indefinitely.
The important thing is that the decision is deliberate. Not rushed, and not based on a best-case budget.
If you're planning an extension in London and want clear pricing, practical advice, and dependable project management, All Well Property Services can help you turn the numbers into a workable build plan. From period-property challenges to staged payment clarity and fixed quotes, the team helps homeowners move forward with confidence.
Free tools to help plan your project
No email required. Get instant estimates and planning answers.
Extension Size Checker
Find out how big you can build your rear extension under permitted development rules. Enter your property type and garden dimensions for an instant maximum footprint calculation.
Planning Risk
Traffic-light check of every planning restriction at your postcode: listed buildings, conservation areas, Article 4 directions, Tree Preservation Orders, flood zones. Live data from Planning.data.gov.uk.
BC Fees Calculator
Estimate LABC plan check and inspection fees for your project. Compare local authority Building Control against private Approved Inspectors, with borough cost adjustments.
Post-Reno Value
Estimate what your property will be worth after planned renovation works. Select the improvements you're considering and get an estimated post-renovation value with a per-improvement breakdown and ROI figure.