So, what exactly is Building Control approval? In a nutshell, it's the process that checks your building work against national standards for safety, health, and energy efficiency, all laid out in the Building Regulations. Think of it as a formal MOT for your home renovation—it’s there to make sure everything is built correctly and is safe for you and everyone else.

The Core Purpose of Building Regulations

An illustration showing architectural plans, a planning document, and a construction worker holding a building control document.

It’s easy to get Building Control and Planning Permission mixed up, but they do completely different jobs. They are two separate legal hurdles, and for many projects, you'll find you need one, the other, or sometimes both. Getting your head around this is the first real step toward a smooth and compliant renovation.

Planning Permission: The What and Where

Planning Permission is all about the bigger picture—the strategic and aesthetic side of your project. It looks at how your proposed work will affect the local neighbourhood, the environment, and the general look and feel of the street.

The planners are asking questions like:

  • Does the design clash with the local architecture?
  • Will it block a neighbour's light or overlook their garden?
  • Is the new use for the building suitable for this area?
  • Does the work affect a listed building or a conservation area?

Essentially, planning is about getting permission for the principle of what you want to build.

Building Control Approval: The How

So, if that’s planning, what is Building Control approval for? It’s purely about the technical nuts and bolts of the construction. It’s there to ensure the work is done to a set of specific, legally required standards that protect people's health and safety.

This technical check-up dives into the nitty-gritty, covering things like:

  • Structural Integrity: Are the foundations solid? Are the walls and roof built to last?
  • Fire Safety: Are there proper escape routes? Have you used fire-resistant materials where needed?
  • Energy Efficiency: Is the insulation in the walls, floor, and loft up to scratch?
  • Ventilation and Drainage: Is there enough fresh air, and are the drains and waste systems installed correctly?

Building Control doesn’t care what colour you paint the walls. It just cares that the walls won't fall down.

The easiest way I’ve found to explain it is this: Planning Permission asks if you can build it, while Building Control asks how you’re going to build it properly.

To make this crystal clear, here’s a quick side-by-side comparison.

Planning Permission vs. Building Control Approval At a Glance

The table below breaks down the key differences between these two essential approvals. It’s a handy reference to see why you might need one, the other, or both for your renovation.

Aspect Planning Permission Building Control Approval
Purpose Regulates how land is used and what buildings look like from the outside. Ensures building work meets technical standards for health and safety.
Focus Aesthetics, local policy, environmental impact, and community effect. Structural stability, fire safety, energy efficiency, accessibility, and drainage.
Question It Answers “Am I allowed to build this project here?” “Is this project being built correctly and safely?”
Governing Body Your Local Planning Authority (LPA). Local Authority Building Control (LABC) or a private Approved Inspector.

Understanding this distinction is absolutely vital. It explains why you can get the green light from the planners but still have a whole other set of rigorous technical demands to meet before you can even think about laying a single brick.

When Do You Need Building Control Approval?

Illustrations of common home renovations and improvements like extensions, loft conversions, windows, and heating systems.

Figuring out when you need to involve Building Control can feel like a bit of a puzzle. The regulations cover a surprisingly wide range of work, and it’s not just about building a new house from the ground up.

As a general rule, if your project involves structural changes, affects fire safety, or messes with the building’s energy performance, you will almost certainly need building control approval. This isn’t just for massive undertakings like a new extension, either. Even jobs that seem pretty straightforward can fall under the regulations, because the rules are all about ensuring safety and performance, no matter the scale.

Common Projects That Need Approval

Most big-ticket home improvements will require a building control application. This includes the kind of high-value renovations many homeowners in London undertake to improve their living space and add real value to their property.

Here are some of the most common jobs where you must get approval:

  • Building a New Extension: Any new extension, from a small kitchen diner in a Fulham terrace to a large multi-storey addition, requires full building control oversight.
  • Loft Conversions: Turning your loft into a proper room like a bedroom or office involves serious structural work and fire safety upgrades, so approval is essential.
  • Internal Structural Alterations: This is a big one. If you’re planning to remove or alter a load-bearing wall, chimney breast, or any part of the building’s core structure, you absolutely need building control on board.
  • Installing a New Bathroom or Kitchen: If the project involves new drainage or you’re creating a new room where one didn't exist before, it will need to be signed off.
  • Window and Door Replacements: When you replace windows and external doors, the new units must meet specific thermal efficiency standards, which falls squarely under Building Regulations.

Remember, the responsibility for compliance rests with you, the property owner. Even if you hire a builder, you are ultimately accountable for ensuring the work has the necessary approvals and gets a final completion certificate.

Changes to Your Home’s Systems

It’s not just the obvious structural work. Building Regulations also cover the critical systems that make your home function. Making changes to these requires approval to ensure they’re installed safely and work efficiently. Honestly, this is a crucial part of understanding what building control approval really is and how far it reaches.

Work on these systems typically needs approval:

  • Heating Systems: Installing a new boiler or a complete central heating system.
  • Electrical Installations: Any new electrical circuits, like for a new extension or a dedicated home office circuit. This is often handled by an electrician registered with a Competent Person Scheme.
  • Drainage and Waste: Altering drainage systems, whether they’re underground or above.
  • Thermal Elements: Adding insulation to walls, floors, or roofs must meet specific performance standards.

The list can feel pretty long, and it's vital to be certain before you start any work. To get a quick idea, you can use a tool like a Building Regulations Checker. It can provide some initial guidance, but for complex projects, especially in period homes across Kensington or Clapham, professional advice is always the way to go. Getting this step right prevents seriously costly and stressful problems down the line.

Navigating The Building Control Application Process

A diagram comparing two routes for building control approval: Local Authority and Approved Inspector processes.

Once you know your project needs the green light, it’s time to get the application rolling. This isn’t a one-size-fits-all journey; you’ve got choices to make about who oversees the work and what kind of application you put in. Each path has its own pros and cons, depending on the scale and complexity of your renovation.

The whole thing kicks off with one key decision. Do you go with your Local Authority Building Control (LABC), the traditional council-run service, or do you hire a private firm known as an Approved Inspector (AI)?

Choosing Your Building Control Body: LABC vs Approved Inspector

Think of this choice like picking between a public service and a private consultant. Your local council's LABC is a non-profit organisation with deep, specialist knowledge of the local area and its specific quirks, like the unique properties you find in Kensington or Clapham.

An Approved Inspector, on the other hand, is a private company or individual licensed to carry out building control work. They often bring a more flexible, client-focused approach to the table, which can be a massive advantage for projects on a tight schedule.

Here’s a quick comparison to help you decide:

  • Local Authority Building Control (LABC): They have a statutory duty to provide the service, which means they can't turn you away. They’re often seen as the default, reliable choice.
  • Approved Inspector (AI): AIs can be more proactive and might offer more tailored advice. They compete for your business, so service levels can be very high, but they can choose which projects they take on.

Ultimately, there’s no single "best" choice. It all comes down to your project's needs and your personal preference for service style.

Selecting The Right Application Type

With your building control body chosen, you now need to select the right type of application. There are three main routes, each designed for different situations.

  1. Full Plans Application: This is the most detailed and, honestly, the most sensible route for major works like extensions or loft conversions. You submit full architectural and structural drawings before any work starts. The building control body checks them thoroughly and, once approved, you have the confidence that your design is compliant.

  2. Building Notice: This is a much simpler process where you just notify your LABC (this option isn't available with AIs) that you intend to start work. It’s faster and cheaper upfront, which makes it tempting for minor jobs like removing a non-load-bearing wall. The risk, however, is much higher as there’s no formal plan approval; compliance is checked as the work happens, which can lead to costly corrections on the spot.

  3. Regularisation: This is the path you take if work was done in the past without building control approval. It’s a retrospective application to have the work signed off, but it’s often complex, and there’s absolutely no guarantee of approval.

For almost any significant renovation, the Full Plans application is the safest and most professional choice. It resolves potential issues on paper before they become expensive problems on site.

The Inspection Process and Getting The Final Certificate

Submitting your application is just the beginning. The real heart of the building control process is the series of on-site inspections. These are crucial checkpoints where the inspector verifies that the work being done matches the approved plans and meets all the technical standards.

The inspection stages typically include:

  • Commencement: When work begins.
  • Foundations: Before the concrete is poured.
  • Drainage: Before the trenches are backfilled.
  • Structural Elements: When steel beams or roof structures are in place.
  • Completion: A final inspection when all work is finished.

After the final inspection is passed, you’ll be issued the all-important Completion Certificate. This is the official document that proves your work complies with the Building Regulations. It’s a vital legal document that you will absolutely need when you come to sell your property.

Learn more about how we manage this from start to finish in our guide on the building control approval process.

This entire system is managed by bodies like the Building Safety Regulator (BSR), which ensures high safety standards, particularly for more complex buildings. To give you an idea of the volume, in just Q4 of a recent year, the BSR made a record 673 decisions—a huge leap from previous quarters. Nationally, they determined applications for 22,768 residential units, with a solid 66% approval rate on determined cases, which shows just how active the system is. For homeowners, this just underscores how important it is to get your application right from the start.

Understanding The Costs and Timelines Involved

Let’s talk about two of the biggest factors in any renovation: time and money. Getting your head around the costs and timelines for building control is a massive part of a successful project. Get it wrong, and you're in for some nasty surprises that can throw your entire budget and schedule out of whack.

The first thing to know is that building control costs aren't a simple, one-size-fits-all fee. The final bill depends heavily on the scale and complexity of your project, plus the route you take for approval—either your Local Authority Building Control (LABC) or a private Approved Inspector.

Breaking Down Building Control Fees

As a rule of thumb, building control fees are worked out based on the estimated cost and intricacy of the construction work. That means a straightforward internal wall removal will set you back far less than a big, two-storey extension.

Here’s how the fees are typically structured:

  • Plan Checking Fee: You pay this upfront when submitting a Full Plans application. It covers the cost of having your architectural drawings and structural calculations professionally reviewed.
  • Inspection Fee: This second payment is due once your builders start on-site. It pays for the inspector to visit at key stages of the build to check the work meets the required standards.
  • Building Notice Fee: If you go down the Building Notice route, you'll pay a single, larger fee right at the start. This is because there isn't a separate plan-checking phase; all the checks happen during the on-site inspections.

Local authority fees are usually standardised and published on their websites, making them easy to find. Approved Inspectors, on the other hand, are private companies, so their rates are competitive. It’s always a good idea to get quotes from both to see who offers the best value and service for your specific project. To see how these costs fit into the bigger picture, have a look at our whole house renovation cost breakdown.

Setting Realistic Timelines

Knowing the timelines is just as crucial as budgeting. The building control process isn’t instant, and it requires some forward planning to make sure you don't end up with builders sitting around waiting for a green light. Delays are frustrating, but understanding the typical stages helps keep expectations in check.

The clock really starts ticking the moment your application is in. A Full Plans application is usually assessed within five weeks, but this can stretch to two months if your project is particularly complex (and you agree to the extension). A Building Notice, in contrast, lets you start work just 48 hours after you’ve submitted it, but it’s a riskier path as any problems are only spotted once the work is already underway.

Recent data shows the system is under real pressure. Statistics from the Building Safety Regulator in late 2023 showed that some decisions were taking a median of 18 weeks, with final approvals taking around 30 weeks nationally.

The situation in London is often even more of a challenge.

Typical Building Control Timelines in London

Here’s a look at how timescales can stack up, particularly in the capital, based on recent data from the Building Safety Regulator.

Process Stage Median Time (National) Median Time (London)
Application to Decision 18 weeks 28 weeks
Decision to Approval 12 weeks 15 weeks
Total: Application to Final Approval 30 weeks 43 weeks

These numbers really drive home why submitting clear, professionally prepared plans right from the start is so important. For homeowners planning projects in South West London, from kitchen extensions in Balham to wet rooms in Forest Hill, this means solid preparation isn't just a good idea—it's essential.

A common mistake is thinking you can start work the minute you've sent off your application. With Full Plans, you absolutely must wait for formal approval. Jumping the gun can lead to being ordered to undo completed work, which costs you both time and a serious amount of money.

At All Well Property Services, our CHAS-qualified contractors and BAFE assessors manage this whole process for you. We make sure all the paperwork is spot-on from day one to keep delays to a minimum and your project moving smoothly from start to finish.

The Risks of Skipping Building Control Approval

Illustration shows a house wrapped in red tape with a warning sign and rejected document, symbolizing risk of non-compliance.

Cutting corners on building regulations might seem like a tempting way to save a bit of time or money, but it’s a gamble that almost never pays off. The consequences of ploughing ahead without building control approval range from inconvenient and expensive to genuinely dangerous, creating long-term headaches for your property and your peace of mind.

At the end of the day, these regulations exist to protect people. Ignoring them means you could be creating a home with hidden structural weaknesses, dodgy fire safety measures, or poor ventilation, putting your family and future occupants at serious risk.

And beyond the immediate safety issues, the legal and financial fallout can be severe.

Local Authority Enforcement Action

Local authorities have some serious powers to enforce the Building Regulations, and they don’t take non-compliance lightly. If they find out unauthorised work has been done, they can take formal action which is both stressful and incredibly costly.

This enforcement can include several measures:

  • Serving an Enforcement Notice: The council can issue a formal notice demanding you alter or even demolish the non-compliant work to bring it up to scratch.
  • Applying for a Court Injunction: In more serious cases, they can seek an injunction to stop you from using that part of your property until it's made safe.
  • Prosecution and Unlimited Fines: Carrying out work without approval is a legal offence. The local authority can prosecute you in the Magistrates' Court, which can lead to unlimited fines.

The council can take this enforcement action at any point within two years of the work being completed. However, their power to issue an injunction or demand the work is fixed for safety reasons has no real time limit.

Thinking you've "got away with it" is a dangerous assumption. An unauthorised loft conversion or extension can come back to haunt you years, or even decades, after the builders have packed up and left.

Financial and Legal Consequences

The financial sting of skipping building control goes way beyond potential fines. The lack of a final completion certificate creates a huge legal and monetary liability that can derail your future plans.

Two of the most common and painful consequences are:

  1. Trouble Selling Your Property: When you sell your home, the buyer’s solicitor will absolutely demand to see the completion certificate for any alterations. If you can’t provide it, it raises a massive red flag. This often leads to sales falling through or forces you to drop your asking price to compensate the buyer for the risk they’re taking on.

  2. Invalidating Your Home Insurance: Most insurance policies have a clause saying your home must comply with all statutory regulations. Unauthorised building work can breach this condition, meaning your insurer could refuse to pay out a claim—even if it’s totally unrelated to the dodgy work. Imagine a kitchen fire where the insurer discovers an unapproved extension and voids your entire policy.

Trying to fix the problem later with a retrospective ‘Regularisation’ application is possible, but it’s an expensive and uncertain path. You may have to open up finished walls or floors for inspection, with no guarantee that approval will even be granted.

The simple truth is that getting it right from the start is the only secure way to protect your investment.

How All Well Property Services Manages Building Control for You

Let's be honest, navigating building control approval can feel like a full-time job. It’s a maze of technical details, endless paperwork, and chasing inspectors. This is exactly where we step in. We take the entire process off your hands, acting as your single point of contact to make sure every stage of your renovation is seamless and, most importantly, fully compliant.

Instead of you trying to make sense of technical jargon or spending hours on the phone, our team handles it all. We manage everything from preparing and submitting the initial application to coordinating every single on-site inspection. It’s all about preventing delays before they happen and keeping your project moving forward smoothly.

Our Integrated Approach to Compliance

We don’t just build; we manage the entire regulatory side of things for you. That means we’re the ones talking directly to either the Local Authority or an Approved Inspector on your behalf. Because we have established relationships and know how to speak their language, we can iron out potential issues before they become expensive problems on site.

This all-in-one service includes:

  • Document Preparation: We put together and submit all the necessary architectural drawings, structural calculations, and detailed specifications needed for a ‘Full Plans’ application.
  • Certified Expertise: All work is done by qualified pros. Our NICEIC-certified electricians handle all the wiring to meet Part P of the Building Regulations, and our Gas Safe engineers take care of all heating and plumbing installations.
  • On-Site Coordination: We schedule and are present for all the mandatory site inspections—foundations, structural steelwork, drainage, you name it—making sure nothing gets overlooked.

By baking compliance into our project management from day one, we take all the guesswork out of it. You can be completely confident that your renovation is not only being built to the highest standard but also to the exact letter of the law.

Delivering Your Completion Certificate with Confidence

Our goal is simple: to hand over a beautiful, functional renovation that is safe, legal, and built to last. The final, crucial step is securing your Building Control Completion Certificate. This isn't just a piece of paper; it's the official proof that your project meets all regulations, and it’s essential for the future value and saleability of your property.

We handle the final inspections and paperwork with meticulous care to ensure this certificate is issued without a single hitch. When you work with us, you’re not just hiring builders; you’re partnering with a team dedicated to protecting your investment. To see how we cover every angle, learn more about our building and structural compliance services. We make sure your project finishes on the right note, leaving you with a home you can enjoy with total peace of mind.

Got a Question About Building Control?

Once you get into the nitty-gritty of a renovation, a few common questions about building control always seem to pop up. Let's clear up some of the most frequent ones so you can move forward with your project confidently.

Can My Builder Self-Certify Their Work?

Yes, sometimes they can, and when it works, it’s a very neat and efficient process. Tradespeople who are part of a Competent Person Scheme (CPS)—think NICEIC for electricians or Gas Safe for heating engineers—can legally sign off on their own work. This means you don't need a separate building control visit just to check their specific job.

But, and it’s a big but, this only applies to their area of expertise. If you're planning a kitchen extension or a loft conversion that involves a whole mix of trades and structural changes, you’ll still need a full building control application for the whole project. The self-certification from your electrician or plumber just neatly slots into that wider approval.

What Happens If a Building Inspection Fails?

First off, don't panic. If an inspector spots something that isn't up to scratch, they'll issue a report explaining exactly what's wrong and what needs to be done to fix it. The project can't legally move past that stage until the issue is sorted and passes a re-inspection.

This is where a good project manager really earns their keep. They'll get straight on it, coordinating with the builders to rectify the problem properly and quickly before arranging the follow-up inspection. It’s all about tackling problems head-on so they don't cause massive delays or blow your budget.

A failed inspection isn't the end of the world, but it's a clear signal that something needs immediate attention. Prompt and proper rectification is essential to keep your project on track and ensure the final build is safe and compliant.

How Long Is a Completion Certificate Valid For?

Forever. A Building Control Completion Certificate is for life—it does not expire. Think of it as a permanent legal document confirming that the work on your property met the required standards at the time it was completed.

You’ll want to file this away somewhere safe, ideally with the deeds to your house. It's absolutely vital for any future sale of the property. A buyer’s solicitor will ask for it as proof that any alterations were done by the book.

Do I Need Building Approval for Minor Repairs?

For the most part, no. Simple, like-for-like maintenance and small repairs don't fall under the building control radar. This covers everyday jobs like:

  • Re-plastering a wall
  • Repainting a room
  • Fixing a leaky tap or swapping out a radiator
  • Rewiring a single light fitting

The line gets a bit blurry when a 'repair' involves replacing a major part of the building's thermal envelope. For instance, replacing one window is fine, but if you're swapping out a significant number of them, or replacing more than 25% of a roof covering, that becomes notifiable work.


At All Well Property Services, we manage these complexities for you, ensuring every aspect of your project is compliant from start to finish. Learn how our end-to-end service delivers peace of mind and a flawless finish.

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy